Skip to content
Email us

Subfloor Preparation

A good floor starts underneath

New flooring is only as good as the floor it sits on. Before we fit, we make sure the subfloor is sound, smooth and level, whether that means plyboarding over floorboards, applying smoothing compound, building up low areas or grinding away old adhesive and other contaminants. It is the part of the job you never see, and the reason a floor looks right and lasts.
Subfloor Preparation

Plyboarding

Plywood laid over floorboards gives a flat, stable base and stops board edges showing through vinyl and LVT.

Smoothing compound

A levelling compound fills dips and cracks so the new floor sits perfectly flat.

Building up levels

Low areas raised so the new floor meets the next room neatly at the doorway.

Grinding away contaminants

Old adhesive, paint and residue removed so the new floor bonds properly.

Recent jobs

Subfloor Preparation we have fitted recently

See more in the portfolio

Questions

Common questions about subfloor preparation

Anything else? Ask during your home visit or give us a call.
Do I need subfloor preparation?

Not always. We check the floor when we measure up and tell you whether any preparation is needed. If it is, it is included in your quote so there are no surprises.

Does preparation add time to the job?

Sometimes. Smoothing compound needs time to dry before the new floor goes down, so a few jobs need an extra visit. We explain the timings when we book the fitting.

Services

Free home visit & measure

Not sure what your floor needs? We will take a look.

Book a visit and we will bring the mobile showroom to your door, measure up and give you a free quote. No obligation.